Connections and controls
Settings
Review integration readiness, cost guardrails, and operating controls. Secret values are never shown or stored in the local demonstration.
Integration readiness
Observed connection state, not assumed capability.
Project folder and authoritative libraries verified.
40 active products and 5 collections available.
Remote repository creation is not available through the current connection.
Subscription and reusable resource inventory unavailable.
Production key and data-classification policy not yet approved.
Intentionally deferred until Phase 3 acceptance.
Approved budget guardrails
Planning ceilings, not committed spend.
Text generation and low-volume infrastructure.
Requires a separately approved Phase 4 pilot.
Must not be enabled without explicit approval.
Environment separation
Controls that remain mandatory.
Databases, queues, storage, secrets, redirect URLs, and accounts.
No credentials in source code or documentation.